Once your contract is signed, we will schedule a site assessment.
Will survey the site, take roof measurements, and note any potential repairs or upgrades needed.
System is designed based on site assessment and approved by homeowners.
After approval of designs, plans will be submitted to local permit office.
Once permits have been approved by the city, we will reach out to schedule an install date.
Typically takes 4-6 hours. Once install is complete, our team will call the city for inspection.
A team member will be sent to your property to wait for the inspector. Corrections will be noted and addressed ASAP.
A member of our team will walk you through the process of turning on your new solar energy system.
Solar energy is the gateway to our future for generating renewable energy. Every second, the sun produces enough energy to sustain Earth’s needs for 500,000 years. Integrating the ability to harness this power within society will make us stronger!
Detailed drawings designed specifically for YOUR solar installation.
We use the plans to help guide you through how the installation will look.
We provide roof drawings with solar panel placement to give to your HOA if needed.
Every Solar Electrical Design is drafted to comply with city codes and NEC regulations
Free revisions if required by the city for permit approval.
Complete shading analysis of your roof for calculating maximum incentive money.